Welcome Guest
Thursday
10.07.2025
02:06
10.07.2025
02:06
building frame house
Site menu |
Search |
Calendar | ||||||||||||||||||||||||||||||||||||||||||||
|
Entries archive |
Statistics |
Total online: 1 Guests: 1 Users: 0 |
Main » 2012 April 12 » House Framed in 5 Days
23:26 House Framed in 5 Days |
House Framed in 5 Days When a plywood subfloor is properly glued to floor joists with a structure adhesive, the subfloor and floor joists tend to act together as a one structural member. The composite T-beam thus formed can span a greater distance than a floor that is fastened only with nails. Glue-nailing of the plywood subfloor is recommended as a cost-effective method of increasing the stiffness and/or allowable space of a floor.Glue-nailing is also highly effective in reducing the floor squeaks and loose nails that may otherwise develop later as a good result of shrinkage of joists. |
|
Total comments: 0 | |